[For House Manufacturers] Precise Bearing Capacity Evaluation Survey for New Building on Weak Ground
Boring survey
Preventing construction troubles and improving quality in new building projects on weak ground.
For house builders aiming to improve quality in new building construction, construction troubles on soft ground are an unavoidable challenge. In particular, insufficient pile length, excessive driving, and the resulting rework can complicate site management and increase costs, potentially affecting the final quality of the building. When there are uneven soft soil layers or sloped bearing layers, traditional investigation methods can lead to misjudgment of the bearing layers, resulting in unexpected subsidence of the bearing layer, additional pile length requirements, or construction interruptions. Our high-precision ground investigation service collects high-density data at multiple points within the site using a fully automated continuous measurement system, clearly visualizing the three-dimensional undulations of the bearing layers and their allowable vertical bearing capacity. This allows us to pre-identify the minimum necessary accurate pile lengths and configurations based on the placement positions under each column, enhancing construction accuracy and contributing to quality improvement. 【Usage Scenarios】 - New building projects on soft ground - Ensuring quality through optimization of pile placement - Prevention of construction troubles - Efficiency in site management 【Benefits of Implementation】 - Improved construction accuracy by preventing excess or insufficient pile lengths - Reduced rework leading to shortened construction periods - Compression of overall construction costs - Realization of safe and smooth site operations
Inquire About This Product
basic information
【Features】 - High-density data collection through a fully automated continuous measurement system - Clear visualization of the three-dimensional undulations of the supporting layer and allowable vertical bearing capacity - Precise identification of the minimum required pile length and pile layout beneath each column in advance - Objective data calculation that eliminates human recording errors and judgment inconsistencies - Capable of reaching a maximum exploration depth of 30m, suitable for hard strata equivalent to an N value of 50 【Our Strengths】 Geotech provides "total ground services," offering a one-stop solution for all tasks related to "ground," including ground surveys and reinforcement design/construction for buildings, settlement correction work for existing structures, and soil contamination investigations. With extensive experience and reliable technology, we create the future of cities from the ground up.
Price range
Delivery Time
Applications/Examples of results
It is utilized for determining pile lengths and optimizing pile layouts in the foundation work of newly constructed mid-rise and high-rise buildings, commercial buildings, and reinforced concrete condominiums, primarily in soft ground areas and urban redevelopment districts. It is ideal for projects that aim to completely eliminate unexpected risks of pile length rework on construction sites and unnecessary excess pile cutting work, thereby reducing site management costs and construction periods for general contractors and construction companies. Additionally, it is widely adopted in construction plans that seek to prevent measurement errors from manual work and to smoothly advance safe pile driving construction based on reliable digital evidence.
catalog(3)
Download All Catalogs
Company information
-







![Ground reinforcement construction [Performance certification method] RES-P method](https://image.www.ipros.com/public/product/image/321794/IPROS6263428337976322716.png?w=280&h=280)

