Not only for regular construction work, but also for emergency response and additional construction during urgent situations!
This product is an infill base that can be combined and used as needed, similar to LEGO blocks. "Inaccessible for large vehicles," "I want to transport necessary materials immediately," "I want to deliver only a small quantity to the site." Even in such situations, it can be transported by a light vehicle, enabling quick responses that leverage mobility. It is suitable not only for regular construction but also for emergency responses and additional work. Please make use of its mobility, which allows for transport by light vehicles, on site. 【Features】 ■ Can be assembled like LEGO ■ Can be loaded onto light vehicles ■ Easy to adapt to narrow sites or difficult-to-access locations ■ Convenient for additional responses in emergencies *For more details, please feel free to contact us.
Inquire About This Product
basic information
For more details, please feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please feel free to contact us.
catalog(2)
Download All CatalogsCompany information
Our company has developed a "steel support" that replaces the traditional "tsuka-ki" used to support the first-floor framing of single-family homes, equipped with adjustment functions and excellent durability, and we have aimed for its widespread adoption under the name "Replacing Tsuka-ki with Kanamono." During the Great Hanshin-Awaji Earthquake, its functionality was proven, and we received high praise from major housing manufacturers. Recently, through competition with other companies in the same industry, coinciding with the spread of precut methods among major and mid-sized builders using traditional construction methods, the transition from the conventional 100% "tsuka-ki" to the stronger and more convenient "steel support" has taken place. The "steel support" has reached an environment where it can be individually performance evaluated, and we have obtained performance certification as the first of its kind. Additionally, as a new challenge, we are progressing from "wooden beams" to "steel beams," and from wooden joists and plywood flooring to "floor panels" that incorporate insulation materials. We are also working on a "floor base system" that allows for quick and easy installation by combining these steel beams and floor panels, as well as a "seismic frame" developed to prevent the collapse of buildings and mitigate impacts during earthquakes, which eliminates the need for braces and hold-down hardware.








