Cracks in the joints and extensive scaffolding costs? Point repair with rope work! Reduce temporary costs and achieve completion in one day with a short construction period.
Are you facing these troubles with the sealing (waterproof joints) replacement process in high places or specific areas? - High scaffold installation costs for partial joint deterioration or rain leak repairs - Difficulty in traditional scaffold installation plans for high floors like 11-story buildings or in narrow spaces - Risks of rainwater intrusion and structural deterioration due to neglecting sealing cuts The "Rope Access Sealing Method" fundamentally resolves these issues. ◇ Reducing temporary costs: Cuts costs associated with scaffold assembly and dismantling, allowing direct pinpoint access to the work area. ◇ Rapid completion in just one day: No need for extensive temporary processes, enabling quick response from site arrival to project completion. ◇ Reliable waterproofing in high and narrow spaces: Achieves a consistent high level of quality from removal to primer application, new sealing filling, and pressure bonding. By eliminating unnecessary temporary costs and enabling rapid waterproof repairs, we support the longevity of buildings. *For more details, please download the catalog or feel free to contact us.
Inquire About This Product
basic information
<Applicable Processes and Specific Concerns> Repair processes for partial joint replacement and reinforcement that occurred only on upper floors. Waterproof repairs in narrow high places where temporary scaffolding cannot be set up due to limited space between adjacent buildings. Emergency initial response and waterproof sealing repairs during localized leaks caused by typhoons or heavy rain. Sites where there is a desire to avoid security reduction, sunlight obstruction, and burden on residents due to scaffolding installation. Preventive maintenance processes aimed at quickly repairing only the highly deteriorated joints in one day as a temporary measure before large-scale overall repairs.
Price range
Delivery Time
Applications/Examples of results
Target objects Condominiums for sale and rent, high-rise office buildings, mixed-use commercial facilities, various RC and SRC constructed buildings Exterior wall joints, sash surrounding joints, ALC panel joints, various expansion joints
catalog(2)
Download All CatalogsCompany information
Our company fully complies with the rope access method specified in ISO 22846 and conducts inspections, surveys, and diagnostics of building exteriors, bridges, slopes, wind turbine blade inspections, etc., by internationally certified personnel (IRATA licensed). Additionally, we carry out various construction projects such as exterior wall renovation work, cleaning work, tile work, sealing work, waterproofing work, and painting work for confined spaces and buildings. Please feel free to contact us if you have any requests.






