Early soil contamination measures during operation! Proposal for efficient on-site remediation.
Soil contamination survey
Early soil contamination measures during operation! Proposal for efficient on-site remediation.
This is a proposal for early soil contamination measures to understand the current status of soil contamination during factory operations and to gradually eliminate potential underground leakage risks. It includes assessing the current situation of the factory, conducting soil contamination surveys during operations, planning preventive measures to prevent new contamination, and introducing on-site remediation and bio-injection technologies that can be implemented through annual plans without stopping operations, thereby leveling the costs required to maintain healthy land.
Inquire About This Product
basic information
Countermeasure Approach: Current situation assessment (hearings, process investigation, risk report), investigation during operation, leak prevention measures, planned purification based on business plans. Response Methods: In-situ purification during operation, bio-injection method for volatile organic compounds, high-precision contamination range narrowing. Cost Plan: Cost leveling plan through annual planning to avoid unexpected high-cost excavation removal.
Price information
Price range
P3
Delivery Time
P4
Applications/Examples of results
Voluntary soil contamination prevention and expansion prevention measures at currently operating factories and business sites. Long-term environmental risk management and budgeting for environmental remediation costs in preparation for future factory rebuilds, land sales, and M&A.
catalog(2)
Download All CatalogsCompany information
-










