How to Clear Acceptance Standards for Construction Residual Soil! Avoid Construction Delays with Compliance Analysis.
Soil survey
How to clear the acceptance criteria for construction residual soil! Avoid project stoppages with efficient compliance analysis.
This is the soil analysis investigation process for the proper disposal of excavated soil and construction waste generated from construction work. Based on the unique regulations of each municipality and the acceptance criteria of disposal sites, efficient sampling and accurate chemical analysis are conducted. It also addresses the additional standards for dioxins and oil content, ensuring that project delay risks and legal risks for the client are effectively avoided.
Inquire About This Product
basic information
Sampling items: Ministry of the Environment standards (approximately 29 items), additional items from local governments (dioxins, oil content, fluorine, etc., totaling over 45 items). Analysis target volume: in accordance with acceptance standards (every 2500m3, every 5000m3, etc.). Sampling methods: double shovels, heavy machinery excavation, self-propelled boring machines, etc., with optimal methods depending on depth.
Price information
-
Price range
P3
Delivery Time
P4
Applications/Examples of results
Analysis of the suitability of receiving construction-generated soil (excavated soil) associated with foundation excavation work and land quality changes in construction and civil engineering. Obligatory surveys based on municipal regulations, compliance with acceptance standards of private disposal sites, and risk management for the client.
catalog(2)
Download All CatalogsCompany information
-






