A new concept wooden structural member that integrates high-durability walls and columns, "Wall Musou 450."
An innovative structural system that enhances the seismic performance of wooden buildings by integrating high-strength walls and columns! Achieves large openings and improves design flexibility.
In wooden construction, ensuring seismic performance and improving spatial design flexibility are important challenges. "Wallless Double 450" is a new structural component that integrates columns and high-strength walls. Despite its width of 450mm, it achieves an industry-leading performance with a wall multiplier of 29 times, significantly enhancing the flexibility of architectural planning by eliminating the need for numerous conventional load-bearing walls. It enables large openings and spacious designs that were difficult with traditional load-bearing walls. This high-strength wall column can accommodate a wide range of applications, from residential to medium and large-scale wooden buildings. 【Features】 ■ Achieves a wall multiplier of 29 times with a width of 450mm ■ Integrates columns and high-strength walls ■ High reliability due to BCJ certification ■ Suitable for both residential and non-residential wooden buildings
Inquire About This Product
basic information
Recommended for those with the following challenges! ✓ Want to improve seismic performance with high-strength walls ✓ Want to reduce the number of columns to create an open space ✓ Planning a large opening wooden structure ✓ Want to conduct seismic design for non-residential wooden buildings ✓ Want to increase design flexibility ✓ Looking for high-strength walls with excellent constructability
Price range
Delivery Time
Applications/Examples of results
【Construction Achievements】 July 2022: H1C Umeda Chayamachi (Osaka City, Osaka Prefecture) November 2022: Ishizaki Residence (Yamanashi Prefecture) June 2023: K Residence (Tokyo Metropolis) November 2023: Shinjuku Hong Kong Cafe (Shinjuku Ward, Tokyo Metropolis) June 2024: Forest Note Office (Minokamo City, Gifu Prefecture) May 2025: Ogori Medical Mall (Ogori City, Fukuoka Prefecture) July 2025: M’s VILLA (Kita-Saku District, Nagano Prefecture) November 2025: S-House (Tokyo Metropolis) January 2026: Sanuki House (Kagawa Prefecture) February 2026: Miyamoto Residence (Osaka Prefecture)
catalog(1)
Download All CatalogsCompany information
Scrimtech Japan Co., Ltd. is engaged in the research, development, and sales of wooden joint hardware necessary for future wooden construction. For inquiries about our [Home Connector], which strongly and beautifully joins wood, and the joint toughness type GIR [Toughness Connector] suitable for mid- to high-rise wooden buildings, please contact us.



![[Construction Case] Kumagai Gumi Fukui Main Office New Building](https://image.www.ipros.com/public/product/image/cfa/2000691599/IPROS64444716077801807052.png?w=280&h=280)





