Compatible with sandy soil at 1000 kN/m². A true method that overcomes narrow sites, large boulders, and groundwater.
Maximum support capacity of 1000 kN. A joint development method by the Ministry of Land, Infrastructure, Transport and Tourism that overcomes high groundwater levels and boulder-laden ground. Technical basis usable for design selection flow and appropriate judgment is disclosed.
This is a technical design document that can be directly used for structural design suitability assessments and confirmation applications. It ensures a high bearing capacity of up to 1000 kN/m2 in sandy soil, allowing for the reduction of foundations for large-scale buildings. Additionally, it presents solutions for challenging conditions that are difficult to address with other methods, such as responding to "high groundwater levels" through flow value management and the removal of "large boulders and rocks" using backhoe construction. A flowchart for selecting construction methods based on support layer depth (GL-3.0m to 6.0m) is also included. [Contents] Overview of the construction method and its reliability Challenges of conventional methods and the technical superiority of this method Design advantages and application conditions Characteristics of quality management
Inquire About This Product
basic information
【Features】 - Add solidifying agents and water to excavated soil to create block-shaped improved bodies - Directly verify the supporting ground and adjust the amount of solidifying agents and water - NETIS registered technology - Performance certified by a construction technology performance certificate 【Our Strengths】 The Elneed Association handles the "Super Lapple Foundation Method (Elneed Method)" and can respond to requests from across the country.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(2)
Download All CatalogsCompany information
The Elneed Association handles the "Super Rappuru Basic Construction Method (Elneed Method)." This method uses stabilized soil created by mixing construction-generated soil with water and cement-based solidifying agents, and it is an improved version of the Rappuru concrete method for construction foundations. Our member companies are located from Tohoku to Kyushu, allowing us to respond to requests from all over the country. Please feel free to contact us when you need our services.






![[NETIS Registration] Super Wrap L Elneed Method](https://image.www.ipros.com/public/product/image/948/2001468954/IPROS84557171936682827911.png?w=280&h=280)


