Improving the durability of concrete structures with insulated form pads for civil engineering.
Insulated Formwork Pad "Thermo Fitter"
Reduce the risk of concrete cracking and improve the durability of structures.
In the civil engineering industry, improving the durability of concrete structures is an important issue. Cracking due to temperature changes accelerates the deterioration of structures, leading to increased repair costs and decreased safety. Especially in cold regions or environments with significant temperature differences, temperature management of concrete is essential. Our insulated formwork pads make it easy to manage the temperature during concrete pouring, reducing the risk of cracking and contributing to the improvement of structural durability. 【Usage Scenarios】 * Cold weather concrete construction * Mass concrete construction * Concrete pouring in environments with significant temperature differences 【Benefits of Implementation】 * Suppression of concrete cracking * Prolonging the lifespan of structures * Reduction of repair costs
Inquire About This Product
Related Videos
basic information
**Features** * 16mm thick body, does not interfere with hook bolts or clamps * Equipped with a protruding handle for easy installation and removal * Rich in flexibility and resilience, fits accurately within the formwork * Excellent chemical resistance and weather resistance * Reusable **Our Strengths** As a pioneer in foam processing, we provide products tailored to our customers' needs. Leveraging the know-how cultivated in the construction and civil engineering fields, we propose optimal solutions.
Price information
*Prices may vary depending on the quantity, so please feel free to contact us.
Price range
P1
Delivery Time
P4
※Delivery times may vary depending on the quantity, so please feel free to contact us.
Applications/Examples of results
Field Adaptation Case: 1) Application Situation: Bridge pier located on the riverbank in the Tohoku region. Concrete was poured during the cold period (from March to early April), and this insulated formwork pad was used as a cold weather curing measure. 2) Application Results: A total of 4,080 insulated formwork pads were installed, with an installation period of 3 days and a removal period of 1 day, allowing for easy and quick construction. The formwork at the end of the bridge pier had a curved surface with a radius of 2.25 meters, which seemed difficult to install, but due to the flexibility of this product, it was able to be installed without coming loose.
catalog(1)
Download All CatalogsCompany information
As a pioneer in foam processing, we assist in manufacturing across construction, civil engineering, electrical products, information devices, industrial machinery, and logistics, while also responding to the needs of customers in various fields as a specialized trading company for rubber, tape, and adhesives. Furthermore, we are building a system for proposing and processing new materials.






