[Construction Case] Railway Reinforcement Embankment Construction Method "RRR (Three R) Method"
We propose railway and road elevated intersections to alleviate general road congestion! Significantly reduce construction space.
We would like to introduce a case study of the railway reinforcement earthwork method "RRR (Three R) Method." In this project, traffic congestion caused by a railway level crossing intersecting with a major road in the city center was a problem. We proposed a method using integrated wall panels with reinforcement materials installed in the ground and bending rigidity. Due to the high rigidity of the wall panels, the restraining effect is strong, allowing us to minimize deformation after completion. 【Case Overview】 ■ Issues - It was required to carry out construction to elevate the railway tracks without interfering with railway operations and while keeping the railway tracks available. ■ Proposal - A method named the rigid wall reinforcement earth retaining wall method. - "Reinforced embankment construction" to create a steep embankment slope. *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
1. Contributing to the harmony between people and the natural environment with outstanding civil engineering technology. 2. Optimally connecting the demand and supply of civil engineering and environmental business. 3. Challenging the creation of new value.