No need for concrete replacement! Ground construction can be done without stopping operations.
We would like to introduce our "Ground Reinforcement RCI Method." Floor construction that would normally take one month if redoing the concrete can be completed in approximately 1 to 2 days. The construction period is shorter, reducing costs to about two-thirds, and the load-bearing capacity of the concrete increases by 1.5 times. Please feel free to contact us when you need our services. 【Features】 ■ Short construction period ■ Low cost ■ High quality *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
【Construction Method Flow】 1. Inject the chemical solution (Solution 1) into the ground and mix it with a drill to solidify the ground around the drill hole. 2. Remove the drill and flow the chemical solution (Solution 2) into the gaps between the concrete floor and the ground, as well as into the drill hole, to create T-shaped columns. 3. Columns are placed at 1-meter intervals to support the concrete floor (the holes are filled with mortar). *For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Our company specializes in ground construction. We address various issues related to loose ground by injecting special agents to solidify voids and the ground, enabling safer and more secure ground reinforcement. With our extensive knowledge as specialists, we achieve ground reinforcement. We prioritize sincerity and trust, and by conducting thorough hearings, we respond to your requests.