If you're troubled by scale in your cooling tower, try "Aqua Crystal Ring."
Aqua Crystal Ring (ACR)
Remove scale from the cooling tower now to prepare for the next season!
\Campaign in progress! 【Limited to the first 3 companies】/ For details, please refer to the "Price Information" section. 【To those in charge struggling with scale removal in cooling towers】 We will completely remove stubborn scale that cannot be removed even with chemicals, "without using any chemicals"! <Do you have any of these concerns regarding scale removal in cooling towers?> ✓ Cooling efficiency is declining due to scale ✓ Maintenance frequency is increasing ✓ Scale cannot be completely removed even with chemicals ✓ Scale reattaches quickly after some time ✓ Replacing the entire cooling tower is too costly ✓ Want to reduce the hassle and cost of adding chemicals ■Benefit 1: Improved cooling efficiency ■Benefit 2: No chemicals needed ■Benefit 3: No maintenance required ■Benefit 4: Cost reduction ■Benefit 5: Environmentally friendly Moreover, our product not only removes scale but also prevents new scale from adhering and has rust prevention effects, significantly extending the lifespan of the equipment and piping inside the cooling tower. We encourage your company, which is struggling with scale removal, to adopt our product, resolve your scale removal issues, and restore the original cooling efficiency of your cooling tower!
Inquire About This Product
basic information
■Product Name: Aqua Crystal Ring ■Size: Diameter: 100mm Thickness: 30mm ■Material: Resin (hardened polyethylene) ■Accessories: Chain, zip tie ■Installation: 1 unit per total water volume of 1m³ *Minimum quantity: 2 units ■Operating Temperature Range: 1°C to 80°C ■Warranty Period: 3 years For information on the safety of this product (Product Safety Data Sheet/SDS), please visit our website below. https://acr.archives.co.jp/specification/ <Features of this Product> ■Feature 1: Easy installation without construction or tools Installation is as simple as attaching it with the included zip tie. Anyone can easily install it. ■Feature 2: No power supply needed, so it can be installed anywhere Many electrolytic devices require a power supply, but this product does not. It can be implemented regardless of location. ■Feature 3: Can be installed without stopping operation This product can simply be placed in water, allowing for installation without stopping operations even in cooling towers that run 24/7. *In some cases, stopping operation may be necessary. ■Feature 4: Can be installed in any type of cooling tower, from large to small It can be implemented in any cooling tower, regardless of size, shape, or type.
Price information
\Campaign in progress! 【Limited to the first 3 applicants】/ We offer the following benefits to companies that request materials. ★Benefit 1: Free test installation for 3 months You can try ACR for free for 3 months. *Limited to medium and small sizes. ★Benefit 2: Free on-site survey fee (Regular price: 29,800 yen) We will conduct an on-site survey for free. Additionally, we will perform a simple water quality test during the survey and analyze the current water quality. *Limited to companies in the Kanto region. Companies outside Kanto will be assisted online with exchanges of site photos, etc. ★Benefit 3: 10% off the quoted amount.
Delivery Time
P4
※We will deliver the product within 5 business days after the order is placed.
Applications/Examples of results
Scale removal and prevention of adhesion in cooling towers We have numerous implementation results for large, medium, and small cooling towers (over 100 in total). ★ We offer a collection of examples with photos (free of charge). Please request our catalog. ◆◆ Huge response! Also effective for rust prevention in chillers and piping! ◆◆ <Removes and suppresses rust in chillers, piping, and heat exchangers> ACR not only removes scale but also has a tremendous effect on rust. In most cases, a large amount of rust accumulates in chillers (cooling water circulation devices) and piping. As a result, it is common for the water inside the chiller to turn bright red (red water). By using ACR, red rust can be converted to black rust, and the cloudy red cooling water can be improved to clear. Moreover, no chemicals are used, and no power supply is required. As long as the effects of ACR last, the rust prevention action is maintained, leading to an extension of the equipment's lifespan and contributing to long-term cost reduction. ★ There are many cases where cloudy red cooling water has become clear. We have numerous examples in our catalog, so please take a look (free of charge).
catalog(7)
Download All Catalogs![Examples of Water Quality Improvement and Their Mechanisms of Action [Technical Explanation Document Vol. 2]](https://image.www.ipros.com/public/catalog/image/01/85f/782048/IPROS18368950748525756649.png?w=120&h=170)
News about this product(2)
Company information
Akaibu Co., Ltd. is engaged in the sale of the "Aqua Crystal Ring (ACR)," which enables scale removal and red water countermeasures for cooling towers. By introducing the Aqua Crystal Ring (ACR), you can eliminate stubborn scale that could not be removed even with chemicals. ✓ Installation is easy; just place it in water. ✓ No chemical spraying required. No power supply needed. ✓ No maintenance required. Since scale is removed thoroughly, cooling efficiency improves, allowing for cost reductions in electricity and other expenses. As it does not use chemicals, it is also environmentally friendly and contributes to SDGs and decarbonization. It is truly a scale removal device that balances economic benefits with environmental performance. For the past 17 years, many customers have adopted our product, and we have received expressions of gratitude. It is common to first try it on one cooling tower and then expand its implementation to all other cooling towers after experiencing its effectiveness. We invite your company, which is struggling with scale removal, to introduce our product, resolve your scale removal issues, and restore the original cooling efficiency of your cooling towers. Shall we achieve cost reductions together?