"Aqua Crystal Ring" for stubborn scale removal that I had given up on.
Aqua Crystal Ring (ACR)
Now is the best time for scale removal from cooling towers.
\Campaign in progress! 【Limited to the first 3 companies】/ For details, please refer to the "Price Information" section. 【To those in charge struggling with scale removal in cooling towers】 We will completely remove stubborn scale that cannot be removed even with chemicals, "without using any chemicals"! <Are you facing these issues with scale removal in cooling towers?> ✓ Cooling efficiency is decreasing due to scale ✓ Maintenance frequency is increasing ✓ Scale cannot be completely removed even with chemicals ✓ Scale reattaches quickly after some time ✓ Replacing the entire cooling tower is too costly ✓ Want to reduce the hassle and cost of adding chemicals ■Benefit 1: Improved cooling efficiency ■Benefit 2: No chemicals needed ■Benefit 3: No maintenance required ■Benefit 4: Cost reduction ■Benefit 5: Environmentally friendly Moreover, our product not only removes scale but also prevents new scale from adhering and has anti-corrosion effects, significantly extending the lifespan of the equipment and piping inside the cooling tower. We encourage your company, which is struggling with scale removal, to adopt our product, resolve your scale removal issues, and restore the original cooling efficiency of your cooling tower!
Inquire About This Product
basic information
■Product Name: Aqua Crystal Ring ■Size: Diameter: 100mm Thickness: 30mm ■Material: Resin (hardened polyethylene) ■Accessories: Chain, zip ties ■Installation: 1 unit per total water volume of 1m³ *Minimum quantity: 2 units ■Operating Temperature Range: 1°C to 80°C ■Warranty Period: 3 years For information on the safety of this product (Product Safety Data Sheet/SDS), please visit our website below. https://acr.archives.co.jp/specification/ <Features of this Product> ■Feature 1: Easy installation without construction or tools Installation is as simple as attaching it with the included zip ties. Anyone can easily install it. ■Feature 2: No power supply needed, so it can be installed anywhere Many electrolytic devices require a power supply, but this product does not. It can be implemented regardless of location. ■Feature 3: Can be installed without stopping operation This product can simply be placed in water, allowing for installation in cooling towers that operate 24/7 without needing to stop operations. *In some cases, stopping operation may be necessary. ■Feature 4: Can be installed in any type, from large to small It can be implemented in any cooling tower, regardless of size, shape, or type.
Price information
\Campaign in progress! 【Limited to the first 3 applicants】/ We offer the following benefits to companies that request materials. ★Benefit 1: Free test installation for 3 months You can try ACR for free for 3 months. *Limited to medium and small sizes. ★Benefit 2: Free on-site survey fee (Regular price: 29,800 yen) We will conduct an on-site survey for free. Additionally, we will perform a simple water quality test during the survey and analyze the current water quality. *Limited to companies in the Kanto region. Companies outside Kanto will be supported online with exchanges of on-site photos, etc. ★Benefit 3: 10% off the quoted amount.
Delivery Time
P4
※We will deliver the product within 5 business days after placing the order.
Applications/Examples of results
Scale removal and prevention of adhesion in cooling towers We have numerous implementation results for large, medium, and small cooling towers (over 100 cases in total). ★ We offer a collection of case studies with photos (free of charge). Please request our catalog. ◆◆ Huge response! Also effective for rust prevention in chillers and piping! ◆◆ <We also remove and suppress rust in chillers, piping, and heat exchangers> ACR not only removes scale but also has a tremendous effect on rust. In most cases, a large amount of rust occurs inside chillers (cooling water circulation devices) and piping. As a result, it is common for the water inside the chiller to turn bright red (red water). By using ACR, red rust can be converted to black rust, and the cloudy red cooling water can be improved to clear. This is achieved without any use of chemicals and does not require a power supply. As long as the effects of ACR last, the rust prevention action is maintained, leading to an extension of the equipment's lifespan and contributing to long-term cost reduction. ★ There are many cases where cloudy red cooling water has become clear. We have published numerous examples in our catalog, so please take a look (free of charge).
catalog(7)
Download All Catalogs![Examples of Water Quality Improvement and Their Mechanisms of Action [Technical Explanation Document Vol. 2]](https://image.www.ipros.com/public/catalog/image/01/85f/782048/IPROS18368950748525756649.png?w=120&h=170)
News about this product(1)
Company information
Akaibu Co., Ltd. is engaged in the sale of the "Aqua Crystal Ring (ACR)," which enables scale removal and red water countermeasures for cooling towers. By introducing the Aqua Crystal Ring (ACR), you can eliminate stubborn scale that could not be removed even with chemicals. ✓ Installation is easy; just place it in water. ✓ No chemical spraying required. No power supply needed. ✓ No maintenance required. Since scale is removed thoroughly, cooling efficiency improves, allowing for cost reductions in electricity and other expenses. As it does not use chemicals, it is also environmentally friendly and contributes to SDGs and decarbonization. It is truly a scale removal device that balances economic benefits with environmental performance. For the past 17 years, many customers have adopted our product, and we have received expressions of gratitude. It is common to first try it on one cooling tower and then expand its implementation to all other cooling towers after experiencing its effectiveness. We invite your company, which is struggling with scale removal, to introduce our product, resolve your scale removal issues, and restore the original cooling efficiency of your cooling towers. Shall we achieve cost reductions together?