The strength of finely crushed natural stone with new technology! It will maintain its strength over the long term.
The "Eco-GEO Method" is a ground improvement technology that uses only crushed natural materials. No waste is generated during construction, and compared to cement and steel, it significantly reduces CO2 emissions. Additionally, curing time, water, post-testing, and pile head treatment are not required. Therefore, foundation work can begin immediately after construction is completed. 【Features】 ■ Obtained building technology performance certification ■ Shorter design length and more economical compared to conventional methods ■ Zero waste and zero leftover soil ■ No need for curing, water, post-testing, or pile head treatment *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
In the region, we design and construct public civil engineering works and crushed stone ground improvement using the "Eco-GEO Method," while also recruiting construction agents for the Eco-GEO Method nationwide.