Introduction to the Eco-GEO Method (Standard Type) and Eco-GEO ZERO Method (No Soil Discharge Type)!
We would like to introduce our residential crushed stone ground improvement work, "EcoGeo Method." With the EcoGeo Method (standard type), no waste (such as empty cement bags or cut steel pipes) is generated during construction, and no artificial materials are left underground. Furthermore, with the EcoGeo ZERO Method (no soil discharge type), no surplus soil is generated during excavation, allowing us to achieve "zero waste and surplus soil" from the construction phase into the future. 【Methods】 ■ EcoGeo Method (standard type) ■ EcoGeo ZERO Method (no soil discharge type) *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
In the region, we design and construct public civil engineering works and crushed stone ground improvement using the "Eco-GEO Method," while also recruiting construction agents for the Eco-GEO Method nationwide.