The installation time is about 4 hours! Here is an example of a general gate that was installed by connecting and integrating with pipes.
We would like to introduce a case where we manufactured and delivered a gate with a modified roof height at FIT GATE. The embedded post, delivery box, and downlights were installed during manufacturing in the factory, and after installing the integrated gate connected by pipes, the contractor completed the finishing work such as wall finishing, resulting in completion. The gate was finished with an exterior similar to that of the house, creating a cohesive look. [Case Overview] ■ Dimensions: Approximately W3,480 × H2,755mm (at the highest point) ■ Installation time: Approximately 4 hours *For more details, please refer to the related links or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the related links or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the related links or feel free to contact us.
catalog(2)
Download All CatalogsNews about this product(1)
Company information
Daikin Corporation aims to "protect human life from the collapse of exteriors during earthquakes" and promotes its seismic exterior business as a social mission, broadcasting from the small rural town of Gujo Hachiman in Gifu to various locations across the country. Craftsmen who inherit traditional techniques carefully create authentic Japanese-style gates, "Sukiya Mon," using carefully selected natural wood (Cypress family, Nootka cypress). Our uniquely developed "FIT Method" produces imaginative original gates and walls, "FIT GATE" and "FIT WALL." We provide seismic reinforcement hardware, "FIT Power," to strengthen old concrete block walls and other structures in anticipation of major earthquakes. We deliver seismic exterior products that fuse traditional Japanese techniques with modern technology.