We have achievements in harbor improvement projects, coastal disaster recovery projects, and quay renovation projects!
We would like to introduce our case studies on the residual formwork method for "coastal" projects. We have implemented disaster recovery work for the JR East Japan Sendai Line Takashiro Town Rikuzen-Ono section, as well as the Urayasu Coast (Hinode) disaster recovery work for the Chiba Prefecture Katsuura Civil Engineering Office. Additionally, we have also carried out the Tago-no-Ura Port Suzukawa District improvement work for the Shizuoka Prefecture Tago-no-Ura Port Management Office. 【Construction Achievements (Excerpt)】 ■ Aomori Prefecture Minato Regional Agriculture, Forestry and Fisheries Office Hachinohe Area Wide Fishing Port Improvement Work ■ Akita Prefecture Akita Regional Promotion Bureau Coastal Disaster Recovery Work ■ Taki County Yamamoto Regional Promotion Bureau Forest Land Degradation Prevention Facility Disaster Recovery Project ■ Ministry of Agriculture, Forestry and Fisheries Fisheries Agency Isohama Fishing Port Coastal Disaster Recovery Work ■ Northern Regional Development Bureau Kitakami River Downstream River Office Old Kitakami River Right Bank Diversion Dike Heightening and Stabilization Work *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(6)
Download All CatalogsNews about this product(1)
Company information
In fact, the term "residual formwork" was created by the National Formwork Industry Association. The National Formwork Industry Association conducts research and development on residual formwork and manufactures and sells residual formwork products across the country, with the participation of over 40 concrete companies nationwide. Residual formwork is used for various applications such as sediment control dams, tidal embankments, steep slope retaining walls, and riverbank protection. We aim to contribute to total cost reduction with residual formwork that responds to future labor-saving and manpower-reducing needs.