[Construction Example] Logistics Center: Floor Leveling Work for Concrete Slab
Forklift operation is possible immediately after construction completion! The unevenness caused by the earthquake has been corrected in a short period.
Here is an example of "floor level adjustment work" carried out at a logistics center in Kumamoto Prefecture. Due to the impact of the Kumamoto earthquake, floor subsidence occurred. As a result of the subsidence, a height difference was created, making it difficult for forklifts to operate for transporting goods. Using two trucks loaded with Upcon equipment, we quickly corrected the subsidence. Immediately after the completion of the work, forklift operations became possible. 【Case Overview】 ■ Construction Area: Approximately 1798.5m2 ■ Maximum Subsidence: 107mm ■ Area: Logistics center in Kumamoto Prefecture ■ Construction Period: 6 days *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(7)
Download All Catalogs![Concrete pavement slab settlement correction method [Joint step difference and base slab settlement correction method]](https://image.www.ipros.com/public/catalog/image/01/2a4/608051/IPROS7464396502897123536.png?w=120&h=170)
Company information
We carry out construction to correct the sinking, tilting, steps, and gaps in concrete floors caused by uneven ground subsidence in buildings such as factories, warehouses, stores, and general residences, using our unique "Upcon Method" with completely non-fluorinated urethane resin and small machinery. Additionally, we are engaged in public works that utilize technologies developed through various research and development projects to restore the functionality of aging social infrastructure such as roads, airports, ports, and agricultural waterways. ■ Features of the Upcon Method 1. Short construction period: The construction time is 1/10 of conventional methods. 2. No interruption of operations: No need to move machinery or cargo. 3. Comprehensive high technical capability: 100% in-house employees. 4. Compact construction system: Quick restoration to the current state is possible. 5. Reduced risk of re-subsidence: Lower risk of re-subsidence compared to conventional methods. Our in-house staff provides total support from on-site surveys across the country to repair planning and construction, taking full responsibility. Our specialized and experienced in-house staff will propose the optimal repair plan tailored to your site. Upcon Co., Ltd. was newly listed on the Nagoya Stock Exchange Next Market on December 26, 2022.