We will solve any ground-related issues in case of emergency. "The house is leaning" "I want to remove the piles."
We will serve as a consultation point in the event of any uneven settlement and provide support until resolution. We also offer guarantees after settlement correction. Additionally, we accept orders for the extraction of existing piles.
Inquire About This Product
basic information
There are three key points to settlement correction and pile extraction work. 1. Nationwide Support …By collaborating with over 70 reliable ground companies nationwide, we have a robust system that can respond anywhere in the country. 2. Fair Pricing …A team of experienced ground professionals will consider appropriate settlement correction and pile extraction work. We deliver safe construction at a fair price. 3. 20-Year Ground Warranty …In the case of settlement correction work, we provide a comprehensive ground warranty that can address any potential re-settlement after the correction, ensuring peace of mind for residents.
Price information
Estimates will be provided on a case-by-case basis. Please feel free to contact us for initial consultations regarding support and estimates.
Delivery Time
※The construction period varies for each project.
Applications/Examples of results
There are three methods for settlement correction work as follows: 1. Underpinning Method …The underpinning method involves using jacks to return a settled house to a level position. The load of the house is countered by driving prefabricated piles, such as steel pipe piles, into the ground with jacks until they reach the supporting soil for restoration. 2. Pressure Plate Method …After the building's settlement has stabilized, this method involves excavating the foundation and placing jacks on a rubble pile made of blocks and steel plates to correct the building's tilt. This method does not require large tools or materials and minimizes the areas that need to be demolished, thus reducing repair costs. It can be carried out with minimal vibration and dust while the residents remain in the building. 3. Pile Extraction Work …In the existing pile extraction work, depending on the type of pile, the first step is to eliminate the friction between the ground and the existing pile by generally covering the pile head with casing and drilling to perform "cutting the edge." After that, the extraction is carried out using a method suitable for the site conditions and soil type.
catalog(9)
Download All Catalogs
News about this product(2)
Company information
Zainju Business Co., Ltd. is developing various businesses to support housing developers. We have established a range of support systems, including structural design consulting, site surveys + government office investigations, ground service projects, and housing-related services.