[Construction Process Video] Elementary School (Gym Floor): Settlement Correction Work
The gymnasium floor that has sunk and warped due to an earthquake and ground subsidence! Short construction period correction using the Upcon method.
We would like to introduce a video of the correction of the sinking floor in the gymnasium of an elementary school located in Miyagi Prefecture. The floor of the elementary school gymnasium has significantly sunk due to earthquakes and ground subsidence. This video explains the construction process of the Upcon method used in the gymnasium. The construction area is 665m2, and the construction period is 6 days. Please take a look. 【Site Information】 ■ Construction Area: 665m2 ■ Construction Period: 6 days ■ Maximum Sinking Amount: 133 ■ Maximum Void Amount: 90mm ■ Area: Miyagi Prefecture *For more details, please refer to the related links. For further information, please check the PDF materials or feel free to contact us.
Inquire About This Product
basic information
*You can view the detailed information through the related links. For more details, please refer to the PDF document or feel free to contact us.*
Price range
Delivery Time
Applications/Examples of results
*For detailed information, please refer to the related links. For more details, please check the PDF document or feel free to contact us.*
catalog(7)
Download All Catalogs![Concrete pavement slab settlement correction method [Joint step difference and base slab settlement correction method]](https://image.www.ipros.com/public/catalog/image/01/2a4/608051/IPROS7464396502897123536.png?w=120&h=170)
Company information
We carry out construction to correct the sinking, tilting, steps, and gaps in concrete floors caused by uneven ground subsidence in buildings such as factories, warehouses, stores, and general residences, using our unique "Upcon Method" with completely non-fluorinated urethane resin and small machinery. Additionally, we are engaged in public works that utilize technologies developed through various research and development projects to restore the functionality of aging social infrastructure such as roads, airports, ports, and agricultural waterways. ■ Features of the Upcon Method 1. Short construction period: The construction time is 1/10 of conventional methods. 2. No interruption of operations: No need to move machinery or cargo. 3. Comprehensive high technical capability: 100% in-house employees. 4. Compact construction system: Quick restoration to the current state is possible. 5. Reduced risk of re-subsidence: Lower risk of re-subsidence compared to conventional methods. Our in-house staff provides total support from on-site surveys across the country to repair planning and construction, taking full responsibility. Our specialized and experienced in-house staff will propose the optimal repair plan tailored to your site. Upcon Co., Ltd. was newly listed on the Nagoya Stock Exchange Next Market on December 26, 2022.