Lightweight construction using half precast results in a sense of unity in the finished product, as approximately half of the slab section is cast on-site, and it also contributes to the reduction of formwork.
This is a mid-floor slab for a shield tunnel based on the "Kaiser Railway Viaduct Slab." It is a rational slab made using high-quality precast (PCa) components manufactured in a factory, excelling in durability and cost-effectiveness. To enhance the integration with cast-in-place concrete, a half-precast mid-floor slab with Kaiser truss reinforcement is installed. After reinforcing the upper rebar as a formwork, fresh concrete is poured to form an integrated mid-floor slab. 【Features】 ■ The Kaiser truss reinforcement serves as a reliable spacer for on-site reinforcement, significantly reducing construction time and labor through improved workability. ■ The integration effect from the Kaiser truss reinforcement provides excellent fatigue durability. ■ It can be constructed without supports, serving as both formwork and scaffolding, eliminating the need for assembly and disassembly of support structures.
Inquire About This Product
basic information
For more details, please download the PDF or contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or contact us.
catalog(1)
Download All CatalogsCompany information
Our company is involved in precast construction methods that streamline work at construction sites, and we have been responding to various challenges and needs of our customers with the keyword of reducing total costs. We will pursue the benefits together with our customers, including the assessment of the feasibility of precasting, and we will provide full support for the next step in this new era. Please feel free to contact us if you have any requests.