It leads to solving general foundation construction issues and improving productivity, resulting in high turnover and high profits.
"Iland Base" is a groundbreaking new construction method that realizes precasting and independence for the foundation's rising portion. In the case of a single building, on-site foundation work usually takes 2 to 3 weeks, but with this method, it can be shortened to about 1 week. By producing and managing the rising portion in a factory, we achieve stable high quality and high strength. Additionally, processes such as finishing the top and outer perimeter of the foundation are no longer necessary, leading to increased efficiency. Pipes can also be routed through the independent sections, allowing for flexible layouts. Please feel free to contact us. 【Features】 ■ Shortened construction period ■ Improved quality ■ Environmental enhancement ■ Increased efficiency *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
"Challenges in Residential Foundation Construction" ■ We must adhere to the schedule despite a shortage of skilled workers. ■ We must prevent future problems from occurring. *For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Our company has been dedicated to the manufacturing of concrete secondary products since its establishment in 1937, adapting to the advancements in concrete technology and the changing needs of the times over many years. During this time, we became a JIS-certified factory and were able to establish a supply system for a wide range of products. We are committed to continuing our efforts as a united team to improve quality. Please feel free to contact us if you have any requests.