The heat source unit that was replaced a few years ago is still in use! An example where the entire roof has started to melt evenly.
We would like to introduce a case study of roof snow melting (hot water type, concealed method) installation. We received a consultation from a quiet hot spring inn that is typically hit by heavy snowfall of over 2 meters each year, stating, "The roof snow melting system installed over a decade ago is not effective, and despite consuming a lot of fuel, it melts poorly. We would like some assistance." The heat source unit that was replaced a few years ago was continued to be used, while almost all other components including panels, copper pipes, supply pipes, and controls were replaced. As a result, the entire roof began to melt evenly, leading to a resolution of the issue. [Case Overview] ■ Nagaoka City, Niigata Prefecture ■ Kerosene boiler ■ 607m² *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(2)
Download All CatalogsCompany information
Hokuyetsu Snow Melting Co., Ltd. is a company located in Tokamachi City, Niigata Prefecture, engaged in roof snow melting, road surface snow melting, and floor heating construction. Our snow melting business was established in 1981 in this region known for its heavy snowfall. Since May 1, 2001, we have started as a specialized company supporting "peace of mind in winter living." For roof snow melting, road surface snow melting, and floor heating, please leave everything from design and construction to maintenance to us.