The progress of red rust completely stopped just one month after installation! A case where the discoloration of the filter also decreased!
This property has been in existence for 33 years, and due to significant red rust blockage at the joints of dissimilar metals in the water supply pipes, we adopted the pipe rehabilitation device "NMR Pipe Protector." Before the installation of the NMR Pipe Protector, a white filter was attached to the kitchen sink water supply faucet for seven days, during which the filter became discolored to a brownish color due to the red rust generated in the water supply pipes. After dissolving the captured iron content with purified water and measuring the iron concentration, it was found that the iron concentration in the water was 21 mg/l, indicating that the red rust corrosion in the pipes was very advanced. One month after installation, a white filter was attached under the same conditions as before, and it was confirmed that the discoloration of the filter had reduced to light brown, with the iron concentration decreasing significantly to 5.8 mg/l. Furthermore, six months after installation, a white filter was again attached under the same conditions, and it was confirmed that the filter's discoloration had nearly reduced to white, with the iron concentration further decreasing significantly to 0.75 mg/l. From this, it can be concluded that just one month after the installation of the NMR Pipe Protector, the progression of red rust was completely halted, and at the same time, the surface of the red rust in the water supply pipes transformed into a non-soluble black rust, resulting in a reduction of iron leaching into the water and a decrease in filter discoloration.
Inquire About This Product
basic information
【Introduction Overview】 ■Location: Izu no Kuni City, Kanagawa Prefecture ■Building Overview: 33 years old, golf course ■Water Supply Method: Elevated Water Tank System ■Installation Date: November 19, 2009 【Installed Piping/Number of Installations】 ■Clubhouse System Lift Pump Secondary Side Lift Piping (SGP Pipe 125mm)/PT-125DS×1 unit ■Elevated Water Tank Secondary Side Water Supply Piping (SGP Pipe 125mm)/PT-125DS×1 unit *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(5)
Download All Catalogs
Company information
~Extending the lifespan of old piping~ "NMR Pipe Protector" Cumulative installation record surpassing 4,300 buildings! (As of March 2022) Among them, over 3,000 installations in condominiums. = Domestic Achievements = New Chitose Airport Domestic Terminal, JR Sapporo Station (JR Tower Building), Imperial Theatre Building (Tokyo Marunouchi), Yaesu Exit Hall, Famous Bookstore Building (Shinjuku), Hotel Toyokaku (Kyoto), Hotel Serve Shibuya, Care House Shirasagi (Saitama), Kawanishi Private Kushi Elementary School, Food Processing Factory, Major Automobile Manufacturer Factory (Fukuoka Prefecture), Kumamoto Red Cross Hospital, etc. = International Achievements = Buckingham Palace, London City Hall, British Museum, BBC, Christ's College, University of Cambridge, Royal Bank of Scotland, Harrods Department Store, Royal Garden Hotel London, UK Parliament, etc. ★ Featured in the Media "NMR Pipe Protector" ★ Selected as one of the top 10 rust prevention technologies in the world in 2020 and introduced in a U.S. magazine! Case studies and customer testimonials have been featured in many media outlets, including TV Tokyo's "World Business Satellite (WBS)," TOKYO MX's "Corporate Spirit," and specialized newspapers "Condominium Management News" and "Air Conditioning Times."