【Scaffolding Construction Achievements】 Dedicated Section of the Second Keihan National Route, Both Directions
To achieve both "ensuring safety for JR" and "shortening the scaffolding construction process," we have adopted a method that involves laying out across the entire length of the rails!
We would like to introduce our construction achievements in the installation of sound-absorbing panels on the underside (during bridge construction). To shorten the construction process of scaffolding on JR, we utilized "rack scaffolding." This site was constructed using a method that allows for the rapid installation of full suspended scaffolding by sending out the scaffolding using rails, rather than as a "mobile suspended scaffolding." 【Overview】 ■ Location/Prefecture: Osaka Prefecture ■ Client: West Japan Railway Company ■ Construction Company: Daitetsu Industry Co., Ltd. ■ Start Date of Use: May 2009 ■ Experience of Local Workers in Rack Scaffolding Installation: Extensive experience ■ Availability of Rack Scaffolding Handling Instructors: Yes *For more details, please refer to the PDF materials or feel free to contact us.
Inquire About This Product
Related Videos
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(4)
Download All CatalogsCompany information
Our company, with the motto "Let's bring products that make the workplace happy," has consistently manufactured equipment that transports people and goods vertically, horizontally, and diagonally using rack and pinion systems. Since developing the "Monorack" for orchards in 1966, we have produced various products including the cargo lift "Rack Lifter," the "Tree Rack" for traversing forests, the shaft elevator "Mog Rack," the mobile scaffolding "Rack Scaffolding," and elevators for port container cranes. Please feel free to contact us if you have any inquiries.