Reduce the hassle of selecting contractors! We provide consistent support from preliminary research and analysis to construction! More than half of the projects are public works, with a recovery record equivalent to approximately 866 schools!
Are you facing any of these concerns when selecting a contractor for asbestos removal and demolition work? - Choosing a construction contractor is difficult... - I want to gather multiple estimates... - I want to hire a company with extensive experience... Our company handles everything from preliminary asbestos surveys and analysis to construction for asbestos removal projects, allowing you to consistently request contractor selection and the often time-consuming estimates. *Support is also available from the design phase of the construction based on the survey. Additionally, we have numerous achievements in all prefectures outside of Hokkaido, and we receive requests for public works in more than half of the projects. 【Removal Quantity Achievements】*As of the end of December 2024 Over approximately 1.3 million m² ⇒ Equivalent to about 866 school-sized buildings (based on 1 school being 1500 m²) ■ Features of the Water Clean Method - Conducts [wetting, spraying, peeling, and suction] using a special simultaneous suction attachment - An environmentally friendly technology that peels off asbestos-containing finishing (exterior wall) coatings while preventing dispersion If you are having trouble with asbestos removal, please feel free to consult us. *For more details, please download the materials or feel free to contact us.
Inquire About This Product
basic information
【Other Features】 - Consistent support from asbestos pre-survey to construction - Uses only water, so it does not pollute the environment - Can perform construction while preventing scattering by simultaneously powerfully sucking up wastewater and debris - Removes a wide range of coatings, including soft, elastic, and hard films - Wet method suppresses dust - Efficiently removes inorganic substrate preparation materials that cannot be removed with stripping agents - Easy to work with even thick multi-layer coatings (films) - Equipment is portable, allowing construction in any location accessible by vehicles (up to about 100m) - Wastewater used is filtered and pH-treated on-site, contributing to cost reduction - Collected removal materials are automatically placed into bulk bags without exposure to outside air, ensuring safety and simplifying industrial waste disposal - Exhaust from the suction during removal is treated with a demister and reliably filtered through a jet scrubber before being released into the atmosphere, ensuring safety *For more details, please refer to the related link page or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
Supports the removal of asbestos-containing finishing materials and inorganic substrate leveling materials. *For more details, please refer to the related link page or feel free to contact us.
Detailed information
-
[Removal Operation] Simultaneously suctioning the peeling material and turbid water while moistening.
-
[Removal Work] Change the attachment and also work on the corner areas.
-
[Comparison Image] After construction (left side) / Before construction (right side)
-
After pH adjustment treatment, it can be released as water through a 0.2μ filter.
-
Treated water will be discharged at the designated local location.
catalog(1)
Download All CatalogsCompany information
We, Maruhou, aim to be the number one company that is needed. As we strive to be a company that is essential to everyone in the world, all of our employees will work together to become a company that receives more gratitude in fields where Maruhou's technology can be utilized.