We provide consistent support from preliminary research and analysis to construction! We contribute to speedy responses and cost optimization even within short construction periods and limited budgets.
Do you have any concerns at the site of asbestos removal and demolition work? - The construction period is short... - The budget is limited... - The preliminary survey and the construction company are separate and cannot coordinate well... Our company handles "everything from asbestos preliminary surveys and analysis to construction" for asbestos removal projects, providing comprehensive support from detailed analysis to the selection of appropriate methods and execution, even within limited time and budget. *Support is also available from the design stage of the construction based on the survey. The "Water Clean Method" generates ultra-high-pressure water using a water jet pump and employs a special simultaneous suction attachment to perform 【wetting】【spraying】【stripping】【suction】 simultaneously, making it an environmentally friendly technology that strips asbestos-containing finishing (exterior wall) coatings while preventing scattering. If you are having trouble with asbestos removal, please feel free to consult us. 【Features】 ■ Consistent support from asbestos preliminary surveys to construction ■ Does not pollute the environment as it uses only water ■ Can prevent scattering during construction by powerfully sucking up wastewater and stripped materials simultaneously ■ Removes a wide range of coatings, including soft, elastic, and hard films *For more details, please download the materials or feel free to contact us.
Inquire About This Product
basic information
【Other Features】 - Since it uses a wet method, it suppresses dust. - It allows for efficient removal of inorganic substrate leveling materials that cannot be removed with release agents. - It can be easily applied even on thick film coatings (paint films) that are layered multiple times. - The equipment is portable, allowing for application in any location accessible by vehicles (up to about 100 meters). - The wastewater generated is filtered and pH-treated on-site, contributing to cost reduction as it can be discharged. - The removed materials are automatically placed into bulk bags without exposure to outside air, ensuring safety and simplifying industrial waste disposal. - The exhaust during suction removal is treated with a demister and reliably filtered through a jet scrubber before being released into the atmosphere, ensuring safety. *For more details, please refer to the related link page or feel free to contact us.*
Price range
Delivery Time
Applications/Examples of results
Supports the removal of asbestos-containing finishing materials and inorganic substrate leveling materials. *For more details, please refer to the related link page or feel free to contact us.
Detailed information
-
[Removal Work] Simultaneous suction of peeling material and turbid water while moistening.
-
[Removal Work] Change the attachment and also work on the corner areas.
-
[Comparison Image] After Construction (Left Side) - Before Construction (Right Side)
-
After pH adjustment treatment, the water can be discharged through a 0.2μ filter.
-
The treated water will be discharged at the designated location.
catalog(1)
Download All CatalogsCompany information
We, Maruhou, aim to be the number one company that is needed. As we strive to be a company that is essential to everyone in the world, all of our employees will work together to become a company that receives more gratitude in fields where Maruhou's technology can be utilized.