We have established a system that can cooperate with a wide variety of construction projects, from investigation to design.
The lime stabilization method is utilized not only for soft ground measures but also in various fields such as excavation work, residual soil management, sludge treatment, industrial waste disposal, and recycling. The procedure begins with the application of solid lime to the roadbed. The applied lime is then mixed with the ground, followed by a second application and mixing. After leveling, compaction is carried out. Our company has established a system to assist with a wide variety of construction projects, from investigation to design. Please feel free to contact us when needed. 【Construction Procedure】 (1) Application (2) Primary Mixing (3) Secondary Mixing (4) Leveling (5) Compaction *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
【Applications】 ■ Improvement of roadbed and subgrade ■ Improvement of foundation ground for structures ■ Enhancement of trafficability for pile driving work sites and temporary roads ■ Prevention of circular sliding on slopes ■ Improvement of embankments and slopes in land development projects ■ Use of surplus soil for disposal and backfill material ■ Improvement of sludge and sediment ■ Deep ground improvement *For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Ueda Lime Manufacturing Co., Ltd. is challenging the development of high-quality products, eco-materials, and ecology-related products by utilizing the infinite potential of lime. With a mission to protect the environment using Japan's resources, we contribute to building a prosperous society for future generations.