This is a method of applying a coating inside the piping without removing the existing water supply pipes.
Our company offers the "Double Lining Method," which allows for the formation of an anti-rust coating on the inner surface of piping without the need to remove steel pipe water supply lines from buildings. The cost is approximately 60% of the expense for replacing the piping, and it can rehabilitate aging pipes that are 30 to 40 years old and in severe deterioration. Additionally, re-lining is possible, leading to long-term cost reduction and an increase in asset value. 【Features】 ■ Uses a sweeper ball (made of urethane) to ensure even coating, including at joints ■ Can be reapplied multiple times ■ Re-lining is possible even for pipes lined by other companies ■ Leak-proof guarantee for 10 years (with two or more coats) and more *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
[Reasons to Choose Us] ■ Significant cost reduction achieved ■ Specific construction methods proposed based on research ■ Over 600 construction achievements *For more details, please download the PDF or feel free to contact us.*
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Our company specializes in plumbing work in the Kanto area, primarily in Tokyo. We adopt the "double lining method," and our experienced staff carry out each task carefully and swiftly, delivering high-quality construction. Please feel free to contact us if you have any requests.