In addition to maintenance specifications, it is installed for transporting equipment! It has been adopted for dam renovation work and underground stairs. *Video available.
The slope lift "Super Tower RN UP106RN" can be used for dam renovation work, underground staircases, slope work beside railway tracks, staircase renovation work, and highway slope work. In the case of installation at the Yamba Dam, the total length of the rail is approximately 65 meters, and since the dam collects water, the lift's rail also goes underwater, so it was custom-made entirely of stainless steel. Additionally, it has been adopted for transporting equipment to the underground staircase of the dam, and since the staircase is curved, three units have been installed with a lift length of 25 meters, divided into three sections. *Video available 【Product Installation Overview】 <Dam Installation Specifications> ■ Maximum rail length: up to 95 meters ■ The portion of the rail submerged in water is custom-made entirely of stainless steel ■ Used for transporting fuel, equipment, and floating objects for boats running inside the dam ■ Used while changing the stopping position of the lift according to the water level ■ Installed for transporting equipment to the underground staircase of the dam *Video available *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【Super Tower RN UP106RN Features】 - Capable of lifting loads with a rail length of up to approximately 95m, tailored to the job site - Achieves high-speed winding of 30-35m per minute with a 1000W electric winch - Customizable according to the job site, including rail length and type of trolley - Wire rope length can be used up to a maximum of 100m - Two types of electric winches to choose from - Operation allows for two wireless remote controls per winch *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
【Installation Examples (Excerpt)】 ■ Mega solar installation site, slope and embankment installation site ■ Installation work on slopes beside railway tracks ■ Staircase renovation work installation ■ Dam renovation work installation ■ Boring survey, transportation of equipment ■ Highway slope renovation work ■ Yamba Dam ■ Azuchi Castle ruins, stone wall renovation work ■ Takeda Castle ruins, stone wall renovation work *For more details, please refer to the PDF document or feel free to contact us.
Detailed information
-
Slope Lift UP106RN
-
Slope lift UP106RN installation example
-
Slope lift installation examples for slope cargo handling.
catalog(1)
Download All CatalogsNews about this product(1)
Company information
Uniper Co., Ltd. has been committed to the mission of "challenging the act of lifting" since its establishment. As the needs of the field have changed year by year, we have developed, planned, and manufactured winches and lifting machines that are in line with the times, responding to the requests of many users. In the scaffolding industry, we have created "high-speed winches for scaffolding lifting"; in the roofing industry, "tile lifting machines"; in the solar power industry, "solar panel lifting machines"; in the construction industry, "board lifting machines"; and for use in warehouses and stores, "simple temporary lifts." In recent years, we have also developed slope lifts that are installed and used for slope construction and stairs. We will continue to create products that satisfy users who prioritize safety, tailored to various applications.