FCR Liner Method (for Different Diameters) [FCR Method Association]
FCR Liner Method (for Different Diameters) FCR Method Association
Repairing the hidden pipe with different diameters on the left and right as it is.
Due to the expansion of single-track lines to double-track lines and the construction of roads parallel to the railway, numerous railway drainage systems (such as inverted siphons and inverted pipes) with different diameters on the left and right sides have been installed. In conventional methods, the lining was adjusted to fit the smaller diameter, and mortar was injected into the gaps to complete the work. We have developed the "FCR Liner Method (for different diameters)" that allows for repairs of inverted siphons with different diameters without changing their original size. *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
【Features】 1. Repairing the hidden pipes with different diameters on the left and right as they are. 2. Improving the satisfaction of nearby residents. ● For more details, please contact us.
Price information
Please contact us.
Delivery Time
※Please contact us.
Applications/Examples of results
Please contact us.
Detailed information
-
Before construction, the different diameter section.
-
Post-construction irregular section
-
Specification
-
[Construction Work] 1. Simple Cleaning
-
【Construction Project】 2. Investigation
-
【Construction Work】 3. Lining Material Installation
-
4. Curing
-
【Construction Project】 5. Pipe Opening Finishing
-
Constructible combinations
catalog(1)
Download All CatalogsCompany information
Company Name FCR Corporation (FCR) *Field Cross drain: Refers to a railway crossing drainage channel. *Repair: Refers to maintenance. Our company operates the FCR Method Association and the Antiviral and Antibacterial Association.