FCR Promotion Method (Steel Pipe Type) [FCR Method Association]
FCR Promotion Method (Steel Pipe Type)
Construction is only possible at the launch shaft.
The FCR construction method association uses the FCR thrust construction method for railway drainage facilities (such as buried drains, buried pipes, and buried gutters) that are severely damaged and cannot be repaired. The FCR thrust construction method has been improved from existing methods, fully considering the characteristics of buried drains, with the highest priority placed on safe construction. *For more details, please download the PDF or feel free to contact us.*
Inquire About This Product
basic information
**Features** 1. Construction is possible solely from the starting side without bringing equipment to the receiving side. 2. The double-casing method allows for the replacement of cutting edges and bits during the pushing process, accommodating changes in ground conditions and underground obstacles. 3. Equipped with a control device to ensure the safety of the operating line during work and work stoppages. 4. Minimum soil cover can be approximately 2 meters with ordinary soil (if less than 2 meters, consideration for track closure is required). 5. Capable of handling a wide range of ground conditions from clay to bedrock. Can clear underground obstacles. 6. Precision adjustment by aiming at the target. 7. Reinforcement with glass liners according to design load. *For further details, please contact us.*
Price information
Please contact us.
Delivery Time
※Please contact us.
Applications/Examples of results
Please contact us.
catalog(1)
Download All CatalogsCompany information
Company Name FCR Corporation (FCR) *Field Cross drain: Refers to a railway crossing drainage channel. *Repair: Refers to maintenance. Our company operates the FCR Method Association and the Antiviral and Antibacterial Association.