Connecting urban comfort with people! Demonstrating features in construction at difficult locations where excavation across tracks and other obstacles is challenging.
We would like to introduce the "Advancement Method" that we implement. There are two main types of underground pipe installation work: the open-cut method, which involves excavating the ground, laying prefabricated pipes at the bottom, and then backfilling, and the non-open-cut method, which allows for underground penetration without surface excavation. The advancement method we employ belongs to the non-open-cut category, which results in less surface excavation compared to the open-cut method. This leads to a reduction in the area occupied by construction, a decrease in construction-related nuisances such as noise, vibration, and dust, and minimizes the impact on traffic and community life. [Features] ■ Underground pipe installation work is divided into open-cut and non-open-cut methods. ■ The non-open-cut method involves less surface excavation compared to the open-cut method. ■ There is a reduction in the area occupied by construction, as well as in construction-related nuisances such as noise, vibration, and dust. ■ It excels in construction at locations where open-cutting is difficult, such as crossing tracks. *For more details, please refer to the PDF materials or feel free to contact us.
Inquire About This Product
basic information
【Overview】 ■ Large and Medium Diameter Pipe Pushing Method ■ Small Diameter Pipe Pushing Method ■ Steel Pipe Pushing Method ■ Reconstruction Pushing Method *For more details, please refer to the PDF materials or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.