Case study of introducing NMR pipe protectors for preventing red rust and extending the lifespan of hotel hot water piping.
At Hotel #RF, which was built 38 years ago, significant red rust corrosion of the vinyl-lined steel water supply pipes had progressed, leading to leaks from the joints. Therefore, a red rust prevention and pipe longevity device called the "NMR Pipe Protector" was installed. Before the installation of the NMR Pipe Protector, a white filter was attached to the water supply faucet, and after running water for four days, the filter turned brown due to the red rust that had developed inside the water supply pipes, revealing an iron content of 40 mg/l, indicating that the red rust corrosion in the pipes was quite advanced. One month after the installation of the NMR Pipe Protector, a white filter was attached at the same location and under the same conditions as before, and the iron content decreased to 23 mg/l. After six months of installation, the iron content further decreased to 14 mg/l, and the red rust inside the pipes transformed into black rust that does not dissolve in water, proving the rust prevention effect and longevity of the hot water supply pipes. At Hotel #RF, it has been verified that if the use of the NMR Pipe Protector continues, all red rust in the air conditioning chilled and hot water pipes will change to black rust, and the cost will be less than one-fifth of the pipe replacement work, allowing the pipes to last until the building's lifespan. Naturally, leaks have been completely prevented since then.
Inquire About This Product
basic information
【Introduction Overview】 ■ Location: Miyagi Prefecture ■ Building Overview: 38 years old, 10 stories, 152 rooms ■ Installation Date: May 2011 ■ Installed Piping/Number of Units: Secondary water supply piping from elevated water tank (VLP pipe 100mm)/PT-100DS×1 unit ■■■■■ Japan System Planning Co., Ltd. ■■■■■ Toll-Free Number: 0120-320-390 <Free Material Request & Inquiries> https://www.jspkk.co.jp/jp/contact/ *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
Over 4,200 installations!
catalog(11)
Download All Catalogs



Company information
~Extending the lifespan of old piping~ "NMR Pipe Protector" Cumulative installation record surpassing 4,300 buildings! (As of March 2022) Among them, over 3,000 installations in condominiums. = Domestic Achievements = New Chitose Airport Domestic Terminal, JR Sapporo Station (JR Tower Building), Imperial Theatre Building (Tokyo Marunouchi), Yaesu Exit Hall, Famous Bookstore Building (Shinjuku), Hotel Toyokaku (Kyoto), Hotel Serve Shibuya, Care House Shirasagi (Saitama), Kawanishi Private Kushi Elementary School, Food Processing Factory, Major Automobile Manufacturer Factory (Fukuoka Prefecture), Kumamoto Red Cross Hospital, etc. = International Achievements = Buckingham Palace, London City Hall, British Museum, BBC, Christ's College, University of Cambridge, Royal Bank of Scotland, Harrods Department Store, Royal Garden Hotel London, UK Parliament, etc. ★ Featured in the Media "NMR Pipe Protector" ★ Selected as one of the top 10 rust prevention technologies in the world in 2020 and introduced in a U.S. magazine! Case studies and customer testimonials have been featured in many media outlets, including TV Tokyo's "World Business Satellite (WBS)," TOKYO MX's "Corporate Spirit," and specialized newspapers "Condominium Management News" and "Air Conditioning Times."