Steel building materials that have a shorter construction period and lower cost compared to steel frame and RC methods! Panel manufacturing is done in-house, achieving high precision and low cost!
The new construction method "CFS Method" is a highly durable and earthquake-resistant 2x4 steel house. The 2x4 steel house uses galvanized steel sheets, achieving high durability! It has 1.5 times the strength of wooden panels while being more cost-effective than RC and heavy steel structures, offering an excellent balance of quality and price. We can respond to various requests, such as reducing costs and shortening construction periods for RC and steel structures, or introducing the CFS method as an alternative to wood. If you have any questions about the introduction of the CFS method or would like a quote, please feel free to contact us. *Please download the catalog as a PDF or contact us for more information.
Inquire About This Product
basic information
【Features】 ■ Proposals can be made at a lower price compared to RC and heavy steel structures. ■ Wall panels have 1.5 times the strength compared to wooden 2x4 and high sound insulation. ■ Less prone to creep phenomena, reducing the burden of after-maintenance. ■ High insulation and airtightness due to external insulation. ■ Resistant to termite damage. ■ Prefabricated frame manufacturing allows for reduced construction time and site costs. ■ First-time introduction is worry-free with the Okui Group support system. *For more details, please download the PDF or contact us.*
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or contact us.
Detailed information
-
Anchor bolts are installed in the foundation to secure the panels.
-
The wall panels for the first floor are transported by Okui Group's trailer and installed with a crane! The work is progressing swiftly.
-
Next, install the floor panels on the second floor after the walls on the first floor.
-
Install the wall on the second floor.
-
This is an image of the floor panel on the second floor as seen from the first floor.
-
We will install the R-level (2nd floor ceiling) floor panels.
-
The roof framing is now complete! If you are introducing the CFS method for the first time, we can also propose to carry out the construction up to this point. We will respond according to your situation, so please feel free to contact us!
catalog(1)
Download All CatalogsCompany information
Our company operates in three divisions: transportation, logistics, and plant machinery, as well as in the environmental sector, focusing on heat-insulating painting work. Additionally, we began manufacturing CFS (Construction using steel for two-by-four housing framework) in February 2018. We offer a wide range of services, including heavy cargo transportation, oversized cargo transport, various machinery installation, crane leasing, warehouse logistics, subleasing, and environmental products such as heat-insulating paint, as well as our CFS manufacturing business. Please feel free to contact us if you have any inquiries.