Introducing the post-installed anchor bolt "R Anchor" that can be extracted after use! *Technical documentation available.
<Anchor bolts that can be completely removed without chipping concrete> They can be extracted by rotating the bolts counterclockwise with strong force after use. There is no need to chip the concrete during removal. Since no concrete debris is generated, it contributes to the reduction of industrial waste. <Contributes to the improvement of concrete durability> There is no need to cut the anchor bolts during removal. Since no cut pieces of anchor bolts remain inside the concrete, the factors causing deterioration are eliminated, leading to improved concrete durability. [Features] ■ Bolts can be extracted by rotating them counterclockwise. ■ No need for concrete chipping or cutting of anchor bolts during removal. ■ Noise reduction. ■ Can be installed at low temperatures (minimum usable temperature -10°C). *For details, please contact us or refer to the catalog. It is recommended to read it alongside the "R Anchor" and "NR Anchor" catalogs.
Inquire About This Product
basic information
*For detailed information, we will contact you from the manufacturer of the R anchor, "Sanpo Co., Ltd."! *For more details, please refer to the catalog or feel free to contact us.
Price information
For more details, please contact us.
Delivery Time
※For more details, please contact us.
Applications/Examples of results
【Purpose】 ■Bridge repair and reinforcement work, etc. *For more details, please refer to the catalog or feel free to contact us.
catalog(2)
Download All CatalogsCompany information
Komai Haltec Co., Ltd. has built a position as a manufacturer that has been involved in the production and construction of steel structures such as bridges and steel frames for many years, supplying safe and high-quality products. Moving forward, we will make the most of our management resources, starting with our main factories in the Kanto and Kansai regions, aiming for efficient business operations that harness our technological capabilities. We will conduct our management with awareness and responsibility as a company that plays a part in the development of social infrastructure through our bridge business, steel frame business, and environmental business.