Pipe anti-corrosion, the Royal Garden Hotel in the UK has introduced NMR pipe protectors.
As a result of verifying the red rust prevention device "NMR Pipe Protector" in the hot water supply piping, a significant cost reduction was achieved, lowering the piping renewal costs to 1/50.
The Royal Garden Hotel London is beloved by travelers from around the world as one of the leading five-star hotels. Constructed in 1965, by 2007, it had been 42 years since its establishment, and the deterioration of the hot water supply pipes had progressed. Due to the use of iron pipes, internal rust corrosion had advanced, resulting in relatively dark red water emerging every morning when the tap was turned on. To address this, three "NMR Pipe Protectors" were installed on the main hot water supply pipe in the boiler room. Before installation, two weeks after installation, and then monthly for 12 months, water quality tests were conducted to measure the iron content in the water due to rust. As a result, it was found that the iron content in the water within the pipes had significantly decreased immediately after installation. Since the effectiveness of rust prevention was quantitatively proven, the hotel also installed NMR Pipe Protectors in the air conditioning pipes. Ultimately, while the cost of pipe renewal was approximately 1.5 billion yen, the total cost of the NMR Pipe Protectors was about 30 million yen, resulting in a cost that was 1/50 of the original estimate. In terms of cost-effectiveness, it far exceeded the hotel's expectations. *Customer feedback (customer testimonials) and other PDF materials are available for free! *Please feel free to contact us first.
Inquire About This Product
basic information
*We are currently offering free PDF materials such as customer testimonials! *Please feel free to contact us first.
Price range
Delivery Time
Applications/Examples of results
*We are currently offering free PDF materials such as customer testimonials! *Please feel free to contact us first.
catalog(17)
Download All Catalogs






News about this product(3)
Company information
~Extending the lifespan of old piping~ "NMR Pipe Protector" Cumulative installation record surpassing 4,300 buildings! (As of March 2022) Among them, over 3,000 installations in condominiums. = Domestic Achievements = New Chitose Airport Domestic Terminal, JR Sapporo Station (JR Tower Building), Imperial Theatre Building (Tokyo Marunouchi), Yaesu Exit Hall, Famous Bookstore Building (Shinjuku), Hotel Toyokaku (Kyoto), Hotel Serve Shibuya, Care House Shirasagi (Saitama), Kawanishi Private Kushi Elementary School, Food Processing Factory, Major Automobile Manufacturer Factory (Fukuoka Prefecture), Kumamoto Red Cross Hospital, etc. = International Achievements = Buckingham Palace, London City Hall, British Museum, BBC, Christ's College, University of Cambridge, Royal Bank of Scotland, Harrods Department Store, Royal Garden Hotel London, UK Parliament, etc. ★ Featured in the Media "NMR Pipe Protector" ★ Selected as one of the top 10 rust prevention technologies in the world in 2020 and introduced in a U.S. magazine! Case studies and customer testimonials have been featured in many media outlets, including TV Tokyo's "World Business Satellite (WBS)," TOKYO MX's "Corporate Spirit," and specialized newspapers "Condominium Management News" and "Air Conditioning Times."