Rockfall mitigation using flexible structures: "Ring Net Rockfall Protection Fence (RX Type)"
During rockfall, a flexible structure rockfall protection fence method that allows for the absorption and dispersion of high energy, with maintenance and management being simple through just component replacement / applicable to railway and sediment control fields.
This is a rockfall protection fence construction method that enables the absorption of high energy up to 3,000 kJ, using a special wire mesh woven in a ring shape (ring net), shock-absorbing components (brake rings) incorporated into the support ropes that suspend the ring net, and wire rope anchors connecting from the top of the support to the ground. 【Applications】 ● Protection for roads, railways, residential areas, public facilities, etc. 【Features】 ● You can choose from six types (RX-025, 075, 100, 150, 200, 300) according to the target energy. ● It is a highly reliable construction method that has obtained construction technology review certification. ● It uses lightweight fence components and has fewer constraints related to the terrain and geological conditions at the installation site, allowing for installation on steep slopes without changing the slope shape. ● It minimizes the amount of tree cutting, and since there is no excavation or concrete pouring on the slope, it reduces the impact on the natural environment and harmonizes with the environment. ● The components that undergo plastic deformation have established replacement criteria, allowing for appropriate maintenance and management after rockfall capture.
Inquire About This Product
basic information
For more details, please refer to the related link page or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
【Purpose】 ●Protection of roads, railways, private homes, public facilities, etc.
Company information
Since its establishment, our company has played a role in national construction, primarily focusing on the "ground improvement field" with our unique grouting method. Subsequently, in response to the changes in social infrastructure development, we have refined our technologies to adapt to the needs of the times and, at times, acquired new ones to expand our business scope. As a result, we have now established three main pillars: "ground improvement business," "slope disaster prevention business," and "pipeline business."