A supplementary method to reduce the existing slit width; the net can be divided, allowing for manual transportation of materials, and installation is also easy.
Install in the slits of existing slit embankments and improve slit functionality by reducing the opening size. 【Purpose】 ● Prevent the outflow of sediment from slit embankments during debris flow events. 【Features】 ● Uses hard steel wire nets employed in high-energy absorption rockfall protection works. ● Components are lightweight, and the ring net panels are separable, allowing for manual transportation. ● Components are treated for corrosion resistance, making installation possible even in environments prone to rust.
Inquire About This Product
basic information
For more details, please refer to the related link page or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
[Purpose] ●Prevent the outflow of sediment from the slit dam during debris flow.
Company information
Since its establishment, our company has played a role in national construction, primarily focusing on the "ground improvement field" with our unique grouting method. Subsequently, in response to the changes in social infrastructure development, we have refined our technologies to adapt to the needs of the times and, at times, acquired new ones to expand our business scope. As a result, we have now established three main pillars: "ground improvement business," "slope disaster prevention business," and "pipeline business."