Pile Construction Management Automation System "Pile Driving King PLUS"
Contributing to work style reform through labor-saving and efficiency improvement! Remote operation is possible from iPad and mobile devices! Achieving improved work efficiency, accuracy, and visibility.
"Pile Driving King PLUS" is a new management system that improves the accuracy of pile construction by utilizing a 3D system and a total station with a camera. Pile construction is challenging because it is difficult to confirm the quality of work and correct defects after construction. Therefore, ensuring thorough construction accuracy and creating construction records are essential. Additionally, to address the pressing labor shortage, there is a demand for increased productivity through the introduction of labor-saving methods. By using four major measurement functions developed in-house, the need for an observer for the total station is eliminated, allowing for further efficiency. By sharing the screen among the measurer, the constructor, and the pile driving machine operator, management without time lag becomes possible. Since we produce in-house, we can incorporate feedback from the field into development in real-time. [Features] ■ Measurement by process is possible (drilling, pile setting, pile embedding completion, etc.) ■ Measurement discrepancies can be seen just by looking at the screen ■ One-man pile center measurement is possible ■ No observer is needed during pile measurement ■ Continuous measurement can be performed without stopping the pile driving machine *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【4 Major Measurement Functions】 ■ Pile Measurement - Automatic measurement of the horizontal position and tilt of piles is possible using image processing technology. ■ Pile Driver Guidance - The position of the pile driver can be automatically recognized, allowing for guidance to the pile installation location. ■ Pile Center Measurement - Confirmation of the pile center before construction can be performed by a single operator. ■ Depth Measurement - Measurement of the depth of piles buried underground is possible.
Price range
Delivery Time
Applications/Examples of results
【Purpose】 ■Civil engineering and construction sites
catalog(1)
Download All CatalogsNews about this product(1)
Company information
"Professional Group of Measurement" With the mission of achieving customer satisfaction, we have an internal structure focused on customer needs, providing services such as surveying, construction management, CM (concrete investigation), geological surveys, design planning, building inspections, environmental surveys, construction CALS/EC support, and system development that meet the "needs of the times." ◇CIM Standardization for Fiscal Year 2023 The Ministry of Land, Infrastructure, Transport and Tourism has introduced ICT to construction sites with the aim of improving productivity, based on the premise of informatization. In the future, it will become commonplace to utilize three-dimensional data in construction as part of CIM standardization. At Kinsoku, we offer a one-stop service for various surveys, including shield surveying and construction surveying, as well as construction management, geological surveys, and design, thereby fully supporting the CIM standardization of construction sites in a way that aligns with construction practices.