◆◆A must-see for those considering greening at pond sites◆◆
This catalog introduces examples of cases used at pond sites. In addition to details such as construction conditions and quantities, it includes photographs showing the progress of greening after construction. Free case study collection!!! [Featured Cases] ■ Project Name: FY 2010 Tsukoe District Pond Improvement Project, Section 1 (Yamagata Prefecture) ■ Conditions: Embankment (hard soil) ■ By Use: Dam/Pond ■ Construction Quantity: 1000m² *For more details, please refer to the catalog or feel free to contact us. ---------------------------------------------------------------------- Rontai offers free slope surveys at construction sites. For more information, please contact your nearest branch or sales office. ----------------------------------------------------------------------
Inquire About This Product
basic information
【Other Case Studies (Excerpt)】 ■Project Name: Abunohana Reservoir (Upper Pond) Prefectural Agricultural Land Disaster Recovery Project〈Kumamoto Prefecture〉 ■Condition: Fill (Sandy Soil) ■By Use: Dam / Reservoir ■Construction Quantity: 1100m2 ■Project Name: Nakayama Prevention (29) No. 1 Reservoir (Nagahoko Pond No. 3) Project〈Ehime Prefecture〉 ■Condition: Cut (Hard Soil) ■By Use: Dam / Reservoir ■Construction Quantity: 945m2 *For more details, please refer to the catalog or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the catalog or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Gentle green spreads across the slopes of the road, blending into the landscape. This green may be what is called "slope greening," which is planned and planted during road construction. Our work in slope greening aims to prevent slope collapse, protect people's lives and communities, and restore damaged ecosystems. With the belief of "green that protects people," Rontai is committed to greening efforts.