Achieving seismic resistance for various types of sewer pipes! Introducing case studies of NS cutting method and remaking lining.
This document introduces the construction achievements of the "NS Cutting Method" and "Remaking Ring" handled by the NS-R Method Association. It includes 69 achievements related to the cutting technology "NS Cutting Method" for installing seismic flexible joints and the non-excavation rehabilitation pipe and manhole connection seismic reinforcement method "Remaking Ring." Please feel free to download and take a look. [Contents] ■ Test construction in Koganei City ■ Seismic joint installation work ■ Sewage disaster recovery work (23 Disaster No. 55-2) ■ External sewage long-life measures work at 83 Komoncho (Section 2) ■ External sewage long-life measures work at 1-1 Myojincho (Seismic joint installation work) *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
[Other Published Content (Excerpt)] ■ Construction of the Hachioji City Public Sewer Comprehensive Earthquake Countermeasure Manhole Toilet System (Part 3) ■ Pipe Rehabilitation Work at 578 Kitano-cho ■ Construction of the Hachioji City Public Sewer Comprehensive Earthquake Countermeasure Manhole Toilet System (Part 6) ■ Earthquake Resistance Work for Manhole Toilet System Construction (Part 8) of the Hachioji City Public Sewer Comprehensive Earthquake Countermeasure Manhole Toilet System ■ Construction of Sewage Branch Line No. 106 in the Shiohama Area, etc. *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
【Usage】 ■Sewer pipes *For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
The NS-R Construction Method Association aims to promote, develop, and improve the technology of the seismic reinforcement methods for sewer pipes, namely the "NS Cutting Method" and "Remake Ring," with the goal of minimizing damage during disasters and contributing to the creation of safe communities. We also hold training sessions to ensure that our members can carry out safe and efficient construction, so please feel free to contact us if you have any requests.