What are the tips to avoid failure for leveling up? Here are the essential rules and check items!
This document provides a detailed explanation of tips and tricks to avoid mistakes when performing NSP top leveling construction for an upgrade. It includes "Three Promises (Essential Rules)" and "Pre-Construction Checkpoints," as well as a "Q&A Collection" regarding storage precautions. We also introduce the acrylic-based mortar adhesive reinforcement material "Chichibu Ace Bond." [Contents] ■ Three Promises (Essential Rules) ■ Pre-Construction Checkpoints ■ NSP Top Leveling Q&A Collection *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【Details of the Publication】 ■Three Promises (Essential Rules) - Remove laitance from the base concrete. - Use 7 to 7.5 liters of mixing water per bag. - Cure with curing sheets or similar materials. ■Pre-Construction Checklist - Is the "NSP Top Leveling" weathered? - Is the specification of the hand mixer acceptable? - Appropriate number of bags to mix at one time. - Environmental factors such as climate and temperature. - How to improve leveling accuracy. - If construction is to be done the next day or before the concrete hardens. - Precautions for winter construction. *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
We are NSP, continuously developing and selling original products overflowing with uniqueness. We are always sensitive to the voices of the market and strive to develop and provide excellent products with distinctiveness. Without becoming complacent with the current situation, we constantly make improvements and continue to challenge ourselves to create products that are in greater demand. For 48 years since our founding, we have been shaping NSP's passionate vision.