Achieving renovation promotion with excellent cost-effectiveness and construction speed! Construction is possible even under conditions with groundwater.
The "Berliplace method" involves inserting a pilot crusher into an existing pipe, expanding and crushing the existing pipe while advancing with a tunneling machine that collects debris, and pushing in a new pipe (PVC pipe). The pilot crusher is equipped with crushing blades and a water-stopping device, allowing construction even under groundwater conditions. It contributes to the longevity of PVC pipes and reduces lifecycle costs. 【Features】 ■ Contributes to the lifecycle cost (LCC) and longevity of sewer pipes through the advantages of PVC pipes ■ Proven advancement rate of over 15m per day ■ Cost reduction achieved through increased tunneling speed ■ Capable of reaching the first manhole ■ Economical *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【Other Features】 ■ Minimal impact on surrounding buried pipes, etc. ■ Can be constructed under conditions below groundwater level ■ Contributes to longevity due to the advantages of PVC pipes, reducing lifecycle costs *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
The Bell Micro Method Association offers the "Bell Method," which has successfully achieved long-distance curved pushing using soft PVC pipes. This method is expected to significantly contribute to the longevity of sewer pipelines and the reduction of maintenance costs. It has received development grants from NEDO and has won the Grand Prize at the National Land Technology Development Award and the Monozukuri Award, and it is also registered with NETIS. Please feel free to contact us if you have any inquiries.