Suppressing landslides and liquefaction! Introducing a construction method that combines drainage pipes and thrust methods.
The "Legend Pipe Method" is a new technique that combines drainage pipes with thrust construction, allowing for the speedy installation of drainage pipes in deep locations. It efficiently lowers groundwater levels and mitigates landslides and liquefaction phenomena. Thanks to the return function of the tunneling machine, it is possible to retrieve the machine by pulling it back to the launch shaft side without needing a receiving shaft. Additionally, the adoption of a slurry method allows for compatibility with high groundwater levels. The tunneling machine is equipped with a gravel crushing bit, enabling it to handle various soil types, including sandy soil, gravelly soil, and soil mixed with coarse stones. 【Features】 ■ Return retrieval type ■ Wide range of applicable soil types ■ Long-distance thrust ■ Landslide countermeasures ■ Liquefaction countermeasures *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【Related Products】 ■ Legend Pipe Method Dedicated Drainage Pipe MPD Pipe (Type 310) ■ Legend Pipe Pushing System (Excavator LEG350 Type) *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Asahi Engineering contributes to urban infrastructure development through the burial of water supply and sewage pipes using the thrust method.