Using multiple digital video cameras, we filmed the tunnel lining while driving, visualizing the condition of the concrete surface!
This system captures images of the tunnel lining while driving using multiple digital video cameras, visualizing the condition of the concrete surface to accurately detect deterioration and deformation such as cracks and water leaks. The obtained image data is converted into a deterioration and deformation development diagram, which can be input into our developed "CrackDraw21," enabling detailed equipment management such as condition verification and analysis of deterioration and deformation characteristics. This system can be utilized for advanced maintenance management, including condition verification of infrastructure and analysis and evaluation through deformation screening. **Features** ◇ Significant reduction in inspection work time Shooting speed: up to 80 km/h ◇ Improved safety of inspection work and working environment (can shoot at high speed without lane restrictions) ◇ Highly reliable development diagrams (can be effectively utilized even when conducting visual inspections separately) ◇ Crack width: shooting resolution and speed can be set according to inspection specifications (width from 0.2 mm) ◇ High-precision image creation through mobile 3D measurement before shooting ◇ Supports the preparation of reports for local governments (CrackDraw21) *For more details, please refer to the PDF document or feel free to contact us.*
Inquire About This Product
basic information
【Other Features】 ■Crack width extraction accuracy (depending on structure and conditions) ・Capable of handling crack widths of 0.2mm or more *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
【Applications】 ■Road tunnels ■Railway tunnels ■Waterway tunnels, etc. *For more details, please refer to the PDF document or feel free to contact us.
Detailed information
-
Tunnel interior shooting conditions
-
Example of shooting results (tunnel development diagram)
catalog(3)
Download All CatalogsNews about this product(2)
Company information
Tosetsu Civil Engineering Consultant Co., Ltd. has been engaged in the maintenance and management of facilities for hydroelectric power generation, such as dams, and civil engineering structures for thermal and nuclear power generation, including intake and discharge channels, through investigations, surveys, measurements, analyses, and diagnostics. Additionally, we have developed systems that capture images of tunnel walls using vehicles equipped with digital cameras while driving through tunnels, as well as systems that efficiently inspect marine structures from ships while controlling the ship's motion.