Introducing a case study of shield arrival construction using the milling mall method!
The "Milling Mole Method," equipped with four special functions: exploration, improvement, cutting, and guidance, is a ground obstacle response type mud-based thrusting method. It consists of three devices: a tunneling machine, a special telescopic pipe, and a special injection pipe, allowing for the precise cutting and removal of underground obstacles. In the construction of the inflow pipe sewer system for the second Nakagawa Chubu rainwater adjustment pond, the Milling Mole Method was used to carry out the shield arrival work. Milling cutting length: The assembly precision of the steel formwork at the arrival section inside the existing shield, L=1.520m from the outer circumference of the existing shield, was excellent, and there were no leaks of groundwater or muddy water during the placement of fluidized treated soil or during the shield cutting with the tunneling machine, allowing for safe cutting. 【Construction Example】 ■Location: Nagoya City, Aichi Prefecture ■Client: Nagoya City Waterworks Bureau ■Contractor: Asanuma Corporation ■Nominal Diameter: φ2200mm ■Thrusting Length: 101.520m ■Underground Obstacles: Direct access to the existing shield Inner diameter of the existing shield φ3750mm *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【Project Overview】 ■Soil Type: Silt and Sandy Soil ■N Value: 9 to 23 ■Gravel Ratio: 10 ■Maximum Gravel Diameter: 60mm ■Groundwater Level: GL-1.28m ■Soil Cover: 12.70m *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsNews about this product(1)
Company information
Yasuda Engineering Co., Ltd. has been a specialized company in public sewer construction, contributing to the environmental development of the local community since its establishment in 1975. We have pursued sound management and advanced technical capabilities, continuing to make steady progress. In 2001, we acquired the international standard "ISO9001" and expanded into the field of general civil engineering. We aim to be a corporate group capable of continuous innovation as a comprehensive construction company, including building construction. "Honing our technology with rich sensibility, we evaluate from a fair perspective to enhance the vitality of the company in order to meet our customers' needs." This is the management policy of Yasuda Engineering Co., Ltd. We, Yasuda Engineering Co., Ltd., are committed to uniting all employees to refine our technical skills and create a new future.