No need to worry about obstacles underground! The tunneling machine detects and captures obstacles about 2 meters ahead and cuts through them! [Collection of achievements available]
You can explore and cut through obstacles buried underground by connecting to existing shields! Since it can be connected with fewer processes, it leads to a reduction in construction time and cost. The 'Milling Mole Method,' equipped with four special functions: "exploration, improvement, cutting, and guidance," consists of three devices: a tunneling machine, special bits, and special telescopic pipes, allowing for the precise cutting and removal of underground obstacles. Using electromagnetic waves, it explores metal obstacles ahead while advancing the tunneling process, and it is also possible to improve the ground from inside the tunneling machine before and after the detected obstacles. If an obstacle is detected, a special telescopic device can be used to cut through the underground obstacle at ultra-low speed, allowing the advancement to continue. The system also includes a mechanism to install a receiving coil at a designated position within the access shaft, guiding the tunneling machine to that position, ensuring high precision in reaching the target even when obstacles are encountered.
Inquire About This Product
basic information
【Obstacles Encountered】 ■ Wooden Piles ■ PC Piles ■ Steel Pipe Piles ■ Steel Sheet Piles ■ H-beams ■ Continuous Walls ■ Concrete Structures *For more details, please download the [Obstacles Performance Collection] or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
Detailed information
-
CASE-7 Steel Sheet Piling 3・H Steel Cutting
catalog(2)
Download All CatalogsCompany information
Yasuda Engineering Co., Ltd. has been a specialized company in public sewer construction, contributing to the environmental development of the local community since its establishment in 1975. We have pursued sound management and advanced technical capabilities, continuing to make steady progress. In 2001, we acquired the international standard "ISO9001" and expanded into the field of general civil engineering. We aim to be a corporate group capable of continuous innovation as a comprehensive construction company, including building construction. "Honing our technology with rich sensibility, we evaluate from a fair perspective to enhance the vitality of the company in order to meet our customers' needs." This is the management policy of Yasuda Engineering Co., Ltd. We, Yasuda Engineering Co., Ltd., are committed to uniting all employees to refine our technical skills and create a new future.