We will resolve water pipe troubles such as red water, rust, and poor water flow!
The "Pipe Lining System" is a pipe rehabilitation construction that removes rust and scale inside pipes through careful investigation and diagnosis, using high-speed air flow and abrasives for removal, polishing, and cleaning. With our water supply pipe rehabilitation technology "NPB-2 Method" and "NPL-3 Method," we ensure peace of mind for a long time with short construction periods. By performing lining twice, we restore clean water. 【Features】 ■ Elimination of red water, rust, and leaks ■ Peace of mind for a long time with short construction periods ■ Reliable methods that are "fast!," "affordable!," "strong!," and "long-lasting!" *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
【Pipe Rehabilitation Method】 ■ NPB2 Method - Certification No. 1001 from the Architectural Preservation Center ■ NPL3 Method - Certification No. 1002-B from the Architectural Preservation Center ■ NPB Rapid Method - Certification No. 1201 from the Architectural Preservation Center *For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Shima Kogyo Co., Ltd. mainly conducts leak investigation and repair work. We also offer steam trap diagnostics, pipe rehabilitation work, plant-related construction, equipment installation, and various factory manufacturing services. Please feel free to contact us if you have any requests.