Many achievements in snow-covered areas! Introducing examples of design and construction of low-temperature response systems!
We would like to introduce a case study of the design and construction of a low-temperature response system building. This system not only meets high quality, low cost, and short construction periods but also has numerous achievements, balancing usability and cost performance. 【Construction Case】 ■ Yokohama Marunaka Seika Co., Ltd. Southern Market Distribution Center (Kanagawa Prefecture) ・Construction: Hishiju Cold Chain Co., Ltd. *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【Features】 ■ Balances usability and cost performance ■ High quality, low price, short construction period *Many achievements in snow-prone areas ■ Reliable one-stop service from design initiation to after-sales support ■ Nationwide coverage (from Hokkaido to Kyushu) and a maintenance-friendly contractor system (KBS Association) *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Kawata Industrial Co., Ltd.'s Construction Division is engaged in the construction of hospitals, offices, and multi-family housing, among other projects. Additionally, we are involved in the design and construction of special buildings represented by the Ushiku Great Buddha, the evolution of system construction methods introduced from the United States for the construction of large space production and logistics facilities, and we contribute to society through the provision of environmental products such as greening and geothermal heat pump systems.