Slope lift "Super Tower RN UP106RN" *Installation examples now available.
Uniper slope lift UP106RN
Great for slope construction and slope renovation work! Capable of lifting up to approximately 95 meters, achieving a high-speed lift of 30 to 35 meters per minute!
The aluminum single-rail lifting machine boasts the strongest strength and has been adopted for rental use since 2013. It is active as a temporary lift for slope construction on mountain slopes and stairs, as well as at mega-solar installation sites and civil engineering construction sites. It allows for safe operations with a focus on improving work efficiency, reducing costs, and ensuring compliance. It can also be used for slope work beside railway tracks, stair renovation, dam renovation, highway slope work, and renovations of shrines and temples. The rail length can be customized up to a maximum of 95 meters to suit the site. A 1000W winch enables high-speed lifting at 30 to 35 meters per minute. *It has also been used for the stone wall renovation at Takeda Castle Ruins and Azuchi Castle Ruins, with installation examples available in the catalog!* 【Features】 ■ Capable of lifting up to approximately 95 meters in rail length, customized to the site ■ Achieves high-speed lifting of 30 to 35 meters per minute with a 1000W electric winch ■ Rail length, type of cart, etc., can be customized to suit the site ■ Wire rope length can be used up to a maximum of 100 meters ■ Two types of electric winches to choose from *For more details, please refer to the catalog or feel free to contact us.*
Inquire About This Product
basic information
【Installation Examples】 - Mega solar installation site, slope and embankment installation site - Slope installation work beside the railway - Stair renovation work installation - Dam renovation work installation - Boring survey, transportation of equipment - Highway slope renovation work - Railway slope renovation work - Disaster area, embankment and slope renovation work - Coastal quay, material transportation - Slope in resort areas, cargo transportation - Power line construction, renovation work and material transportation - Shrines and temples, renovation work 【Product Details】 - Electric winch (UP711ZN, UP787A) - Aluminum rail (joint type) - Standard cart: H750mm × W650mm × D300mm - Long cart: H1200mm × W650mm × D300mm - Intermediate roller: Wire thread prevention roller (used attached to rail step) - Upper pulley (hat type): Inserted into the joint at the tip of the rail for use - Standard curved rail: Used for sharp angle adjustments - Intermediate curved rail: Used for gentle angle adjustments - Rail support pillar: Three height variations - Upper pillar: Two height variations - Intermediate rail: Seven length variations - Upper and lower limit switches: Upper and lower limit switches - Wireless remote control unit: UP700RC (optional)
Price range
Delivery Time
Applications/Examples of results
【Installation Examples】 〇 Mega solar installation site, slope and embankment installation site 〇 Slope installation work beside railway tracks 〇 Stair renovation work installation 〇 Dam renovation work installation 〇 Boring survey, transportation of equipment 〇 Highway slope renovation work 〇 Railway slope renovation work 〇 Disaster area, embankment and slope renovation work 〇 Coastal quay, material transportation 〇 Slopes in resort areas, luggage transportation 〇 Power line construction, renovation work and material transportation 〇 Shrines and temples, renovation work ・Yamba Dam ・Azuchi Castle ruins, stone wall renovation work ・Takeda Castle ruins, stone wall renovation work
Detailed information
-
At the ruins of Azuchi Castle, stone walls were used for the stone wall repair work. A 70-meter long rail and a winch were installed on the upper part of the rail.
-
The construction work for the renovation of the stone walls at Takeda Castle ruins involves assembling a turret for use, with a rail length of 30 meters and a winch installed at the top of the rail.
-
Installed as the elevation equipment for the Yamba Dam, the rail length is 65 meters, and the rail is custom-made entirely of stainless steel, with the winch installed at the top of the rail.
-
Used at the mega-solar construction site on the mountain slope, the rail length is 36 meters, and the winch is installed under the rail.
-
Used for slope construction beside the railway tracks. The 8-meter rail winch is installed above the rail.
-
Used for slope renovation work. The winch with a rail length of 50m is installed on the upper part of the rail.
-
Installed on the slope of the mountain. Used for building houses at the summit where vehicles cannot access. The rail length is 60 meters, and the winch is installed at the top of the rail.
-
Used for transporting luggage to the stairs. The winch with a rail length of 10 meters is installed in the middle of the rail.
-
It was used for the installation of a sloped mega-solar system. The winch with a rail length of 40 meters is installed at the top of the rail.
catalog(1)
Download All CatalogsNews about this product(1)
Company information
Uniper Co., Ltd. has been committed to the mission of "challenging the act of lifting" since its establishment. As the needs of the field have changed year by year, we have developed, planned, and manufactured winches and lifting machines that are in line with the times, responding to the requests of many users. In the scaffolding industry, we have created "high-speed winches for scaffolding lifting"; in the roofing industry, "tile lifting machines"; in the solar power industry, "solar panel lifting machines"; in the construction industry, "board lifting machines"; and for use in warehouses and stores, "simple temporary lifts." In recent years, we have also developed slope lifts that are installed and used for slope construction and stairs. We will continue to create products that satisfy users who prioritize safety, tailored to various applications.